Securing an integrated permit despite an active NGO campaign and dozens of parallel proceedings

Client: large manufacturing plant in Poland | 

The situation

A manufacturing plant that had been operating lawfully in Poland for many years became the target of a coordinated campaign by environmental organisations and local opposition groups. Multiple parallel administrative and court proceedings were initiated, all aimed at a single goal: blocking the plant’s right to operate. At the same time, the client needed to obtain an integrated permit (IPPC), without which continuation of operations would have been impossible.

Our role

We took over the conduct of all administrative and court proceedings relating to the client’s operations, including proceedings before the environmental inspectorate. In parallel, we ran the full integrated permit procedure, managing the risk of delays caused by the environmental organisations’ activity at every stage. We coordinated communications with the authorities and built the legal arguments to counter successive challenges.

The result

The integrated permit was obtained. The plant continues to operate without interruption. Securing this critical decision under conditions of active opposition and numerous parallel proceedings is one of the most demanding achievements in our practice and the clearest illustration of what investment process security means in practice.

Is your investment or installation facing NGO or local community opposition? Get in touch.

Security of the investment process

Many investments are not stopped by regulations – they are stopped by public protests, the actions of environmental organisations, prolonged proceedings, and risks that were not properly managed. We advise investors at every stage of the investment process, from the first decision through to effective defence before the courts in any disputes that may arise.

More

They may be interested you

I want to obtain biological material for research purposes, should I consider the Convention on Biological Diversity and the Nagoya Protocol?

Client Global chemicals and Life Sciences group The situation The Convention on Biological Diversity and the Nagoya Protocol on access to genetic r...

Case study Product law

I want to obtain biological material for research purposes, should I consider the Convention on Biological Diversity and the Nagoya Protocol?

Trade Inspection is challenging my product compliance- how do I defend myself in proceedings and limit my risk?

Client Operator of a discount store chain with a wide non-food assortment The situation Growing EU regulatory requirements on product safety, label...

Case study Product law

Trade Inspection is challenging my product compliance- how do I defend myself in proceedings and limit my risk?

The EU plans to ban PFAS in my products under REACH – how do I build an advocacy strategy and secure an exemption or transition period?

Client Global manufacturer in the technology and industrial sector The situation The pan-European REACH restriction proposal on PFAS covering all n...

Case study Product law

The EU plans to ban PFAS in my products under REACH – how do I build an advocacy strategy and secure an exemption or transition period?

See all

Do you need legal support for an investment or product?

Write or call – we'll answer you specifically
and without unnecessary theory.